Chris Salter

art / design / research / writing

A collaboration with CTM 14, N-Polytope was reworked for the immense old swimming pool in the Stattbad Wedding.

 

Locations

Stattbad Wedding
Berlin
January 26, 2014-February 23, 2014

Collaborators

Concept and Direction: Chris Salter
Composition: Chris Salter and Adam Basanta
Architectural Design: Thomas Spier
Lighting and Laser System Design: Elio Bidinost
Embedded Systems, Micro Light and Sound Design, Media Composition Programming: Marije Baalman
Assistance (lasers and installation Berlin): Constantin Engelmann
Media Behavior Modeling and Programming: Sofia Audry
Structural Consultant: Schlaich Bergermann and partner/David Sommer
Electronics Assembly: Rene Wassenburg (Schrikdraad Ontwerp) and Stan Verberkt

Press

http://kcornils.wordpress.com/2014/01/27/spex-online-n-polytope-im-stattbad-wedding/

http://www.globe-m.de/en/boulevard/den-himmel-voller-sensoren

http://www.tagesspiegel.de/kultur/medienkunst/9384164.html

http://www.gonzocircus.com/club-transmediale-2014-mannen-met-koffertjes-vol-herontdekkingen/